BE SAFE

안전을 우선적으로 생각하며 책임과 사명을 다하는 기업입니다.

탈질설비
  • 금호석유화학 4호기 보일러 환경설비
    SCR SYSTEM
    Construction Period 2021. 02 ~ 2022. 12
    Client현대중공업파워시스템
    Location여수
    ApplicationBoiler
    Capacity319,907 Nm3/hr
    Reducing AgentUrea solution (35%)
  • GS칼텍스 No.2&3 Cogen
    HRSG SCR SYSTEM
    Construction Period 2020.12 ~ 2021.10
    Client현대중공업파워시스템
    Location여수
    ApplicationCOGEN SYSTEM
    Capacity534,240 kg/hr
    Reducing AgentAmmonia solution (9%)
  • 여천NCC 동력#2 SCR SYSTEM
    for 4units
    Construction Period 2020. 03 ~ 2021. 04
    ClientNCC
    Location여천
    ApplicationBoiler
    Capacity100,360 Nm3/hr x 3units
    155,440 Nm3/hr x 1unit
    Reducing AgentUrea solution (40%)
  • S1 BIOMASS
    SCR SYSTEM
    Construction Period 2019.04 ~ 2021.04
    ClientSHI Forster Wheeler
    Location새만금
    ApplicationCFB Boiler
    Capacity323,280 Nm3/hr
    Reducing AgentAmmonia solution (25%)
  • 삼성전자 광역소각로 SCR SYSTEM
    촉매 납품 및 교체공사
    Construction Period 2020. 04 ~ 2020. 12
    Client삼성전자
    Location수원
    Application소각로
    Capacity40,000 Nm3/hr
    Reducing AgentUrea Solution (40%)
  • 당진 LNG 1호기
    HRSG SCR SYSTEM
    Construction Period 2019.05 ~ 2020.02
    ClientGS EPS
    Location당진
    ApplicationGas Turbine HRSG
    Capacity985,392 kg/hr x 2units
    Reducing AgentAmmonia solution (9%)